Metro finishes escalator project at Dupont Circle

105789503_20110428214935_JPG

Copyright 2011 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Advertisement

Posted: 10/21/2012

WASHINGTON (AP) -  

Metro says it's completed an eight-and-a-half month escalator replacement project at the Dupont Circle station.
 
The transit system on Sunday opened three new escalators at the station's south entrance.
 
Metro General Manager Richard Sarles says the project was necessary because the old escalators at the south entrance were among the least reliable in the system, and the original manufacturer had gone out of business.
 
Metro has a multi-year plan to improve escalator service. It plans to replace 94 escalators over the next seven years.

Copyright 2012 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • Comments
Advertisement

Special Reports


  1. SPECIAL REPORT | Day care inspections

    SPECIAL REPORT | Day care inspections

    SPECIAL REPORT | Thousands of child care center inspections reports are NOW AVAILABLE. Find out what inspectors founds inside day care centers across the state.

    • Inside a Criminal Mind | Jason Scott

      Inside a Criminal Mind | Jason Scott

      SPECIAL REPORT | When it's out of your hands, when your life is at the mercy of an armed, masked man staring down at you from the barrel of a gun in your own home, you grasp at whatever it is you can control; breathing, composure, or faith.

    • SPECIAL REPORT | Bad Medicine

      SPECIAL REPORT | Bad Medicine

      SPECIAL REPORT | ABC2 Investigator Joce Sterman has reviewed thousands of pages of documents for her Bad Medicine report.

       
      • Stay Connected