Major construction begins at 9p.m. on I-895, signficant delays expected at Harbor Tunnel

Drivers urged to avoid I-895 at Harbor Tunnel

895 construction begun


Photographer: WMAR
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Construction on 895


Photographer: WMAR
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Construction on 895


Photographer: WMAR
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

895 construction begun


Photographer: WMAR
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

More closures on the way


Photographer: WMAR
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

More closures on the way


Photographer: WMAR
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Advertisement

Posted: 06/06/2012

Major construction began at 9p.m. Wednesday on Interstate 895.
 
It's expected to cause heavy traffic delays at the Harbor Tunnel through the end of summer.
 
Crews will replace concrete decking on a four-lane bridge south of the toll plaza.
 
The worst delays are expected during the first two weeks of August, when traffic is reduced to one lane in each direction.
 
The Maryland Transportation Authority urges motorists to avoid Interstate 895 until the project is finished. Drivers should use the Fort McHenry Tunnel or Francis Scott Key Bridge until construction is complete.

Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

  • Comments

 

 


 

Advertisement

Special Reports


  1. SPECIAL REPORT | Day care inspections

    SPECIAL REPORT | Day care inspections

    SPECIAL REPORT | Thousands of child care center inspections reports are NOW AVAILABLE. Find out what inspectors founds inside day care centers across the state.

    • Inside a Criminal Mind | Jason Scott

      Inside a Criminal Mind | Jason Scott

      SPECIAL REPORT | When it's out of your hands, when your life is at the mercy of an armed, masked man staring down at you from the barrel of a gun in your own home, you grasp at whatever it is you can control; breathing, composure, or faith.

    • SPECIAL REPORT | Bad Medicine

      SPECIAL REPORT | Bad Medicine

      SPECIAL REPORT | ABC2 Investigator Joce Sterman has reviewed thousands of pages of documents for her Bad Medicine report.

       
      • Stay Connected