Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Posted: 12/07/2012
BALTIMORE (WMAR) - The Department of Public Works announced that they are entering their final phases of repairing a massive water main break that resulted in a sinkhole over the summer.
The 120-year-old storm drain tunnel collapse was 10 feet in diameter.
The storm drain tunnel has been replaced with steel lining between Patterson Park and Montford Avenue.
DPW officials hope this upgraded repair will help prevent a future collapse.
In addition, a nine foot shaft has been installed to make future rehabilitation of the storm drain system easier.
Crews are currently working to repair the sidewalk and curb.
"The tremendous cooperation between merchants, community members, Verizon, BGE, other city agencies and DPW has enabled us to reach the final stages of this massive undertaking," said Director Alfred H. Foxx.
"We look forward to completing the project this month," he said.
Copyright 2012 Scripps Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Special Reports
SPECIAL REPORT | Thousands of child care center inspections reports are NOW AVAILABLE. Find out what inspectors founds inside day care centers across the state.
SPECIAL REPORT | When it's out of your hands, when your life is at the mercy of an armed, masked man staring down at you from the barrel of a gun in your own home, you grasp at whatever it is you can control; breathing, composure, or faith.
SPECIAL REPORT | ABC2 Investigator Joce Sterman has reviewed thousands of pages of documents for her Bad Medicine report.
More Baltimore City News
A one-year-old child is dead following a shooting in Cherry Hill Friday evening.
